Third Sun Solar Commissioning Process

Once a system is installed, one of our solar technicians completes an extensive inspection/system commission before the system can be energized. A commissioning form is filled out and kept on record for every installation.

Once the system has been commissioned and all solar components are operating within their design parameters, the system may be energized.

In addition to the Third Sun Solar commissioning process, the State of Ohio and the Electric Utility must inspect the system to ensure that it complies with all applicable building and electrical codes before the solar electric system is permitted to remain in operation.

WordPress database error: [Table './thirdsun_wp/tss_comments' is marked as crashed and last (automatic?) repair failed]
SELECT SQL_CALC_FOUND_ROWS tss_comments.comment_ID FROM tss_comments WHERE ( comment_approved = '1' ) AND comment_post_ID = 2153 ORDER BY tss_comments.comment_date_gmt ASC, tss_comments.comment_ID ASC